New Arrivals/Restock

EPC SCHEDULING SIMPLIFIED: A Step-by-Step Guide for the Development of Engineering, Procurement, & Construction Schedules Kindle Edition

flash sale iconLimited Time Sale
Until the end
01
13
11

$5.99 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
New  $9.99
quantity

Product details

Management number 227581813 Release Date 2026/05/09 List Price $4.00 Model Number 227581813
Category

EPC Scheduling SimplifiedA Step-by-Step Guide for the Development of Engineering, Procurement, & Construction Schedulesby Cesar RamosEPC Scheduling Simplified is the definitive handbook for anyone working in Engineering, Procurement & Construction (EPC) environments. Whether you're a project scheduler, planner, engineer, construction manager, cost controller, or EPC leader, this book gives you a clear, real-world understanding of how to build, analyze, and manage schedules from concept to commissioning.Written by EPC project controls expert Cesar Ramos, this guide goes far beyond schedule practices. It teaches you the actual logic sequence, workflow modeling, schedule integration, and deliverable-based sequencing required to run high-stakes capital projects.What You’ll LearnHow EPC projects flow from FEED/FEL through Detail Design and ConstructionHow to convert engineering deliverables into schedule fragnets and path-driven logicHow procurement, long-leads, vendor data, and fabrication truly control schedule riskHow to build construction logic around access, materials, and path of constructionHow commissioning systemization shapes the final critical pathHow to apply rolling wave planning used by top EPC firmsHow to perform schedule health checks, industry metrics, and schedule diagnosticsHow to maintain forensic-ready baselines and conduct Time Impact Analysis for claimsWho This Book Is ForEPC Planners & SchedulersProject Controls ProfessionalsEngineers (Process, Mechanical, Piping, Electrical, Civil)Construction Managers & SuperintendentsRisk Analysts & EVM SpecialistsContract Managers and Claims AnalystsAnyone preparing for EPC project controls rolesWhy This Book Is DifferentMost scheduling books stay theoretical. This book is unapologetically practical. It teaches you how schedules actually work on real projects, under real pressure, with real constraints.If you're serious about project controls—and want to become a strategic leader instead of a date-enterer—this book is your playbook.Perfect for EPC, Oil & Gas, Petrochemical, LNG, Energy, Utilities, and Large Capital Projects. Read more

ASIN B0G5WHC4TG
XRay Not Enabled
Language English
File size 15.9 MB
Page Flip Enabled
Publisher Cesar Ramos
Word Wise Enabled
Print length 153 pages
Accessibility Learn more
Screen Reader Supported
Publication date December 9, 2025
Enhanced typesetting Enabled

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review